Domestic Project:
21 Panel Ground Mount

Client: Ashmans Hall

Installation: May 2022
Array: G.S.E. Ground Mount.

Modules: 21 German QCells ML G9 385W
System Size: 8.08KW

Annual Generation: 8283kWh

Tree Value: 49*

Annual CO2 Reduction: 1974kg

​

Project brief: Reduce electricity costs, supply carbon free electricity to the home and holiday cabin. Compliment the estate's sustainability and biodiversity plan.


* Tree value equivalent to 30 year oak trees co2 reduction.

bennetts.JPG

Commercial Project:
100 Panels Flat Roof 

Client: Bennetts Funerals

Installation: March 2023
Array: Esdec Flat Roof Fusion Fix

Modules: 100 German QCells ML G9 385W +
System Size: 38.5KW

Annual Generation: 27674 kWh

Tree Value: 1329*

Annual CO2 Reduction: 7000 kg

​

Project brief:
Reduce dependency on grid supplied electricity, and lower carbon and nuclear footprint, substantially lower energy costs.

 

Challenges: 
Funding: Awarded €10,000 EU
grant.

Planning: Listed Building Consent. Grade II

G99 Approval, export limitation.


Design: 300A 3 Phase supply and 100A single Phase Supply for 3 buildings with unbalanced loads. Design included 6 separate Sunsynk inverters.
* Tree value equivalent to 30 year oak trees co2 reduction.

bennetts.JPG
Cart Lodge.JPG

Domestic Project:
26 Panel Cart Lodge

Client: Mr & Mrs Atkins

Installation: August 2023
Array: 26 Panels Fastensol  

Modules: 26 Spanish Eurener 400W All Black
System Size: 10.4 kW

Annual Generation: 8869 kWh

Tree Value: 420*

Annual CO2 Reduction: 2200 kgs

​

Project brief: 
The home is entirely power by electricity the objective to substantially lower energy costs.

 

Challenges: 
Roof Space: Client specified only the roof of the cart lodge could by used.

G99 Approval, export limitation.

 

Design: 2 x Sunsynk 5 KW Ecco Inverters with 30.7 KW Sunsynk LiFEPo4 Batteries.
 

* Tree value equivalent to 30 year oak trees co2 reduction.

Domestic Project:
38 Panel 2 Barn Roofs

Client: George's Farm

Installation: November 2023
Array: 28 Panels Landscape & 10 Portrait   

Modules: 26 Spanish Eurener NEXA 430W
System Size: 16.34 kW

Annual Generation: 14690 kWh

Tree Value: 706*

Annual CO2 Reduction: 3700 kgs

​

Project brief: 
The farm consumes substantial electricity. Apart from cost reduction, the clients wanted minimal dependency on the grid.

 

Challenges: 
The panels location in excess of 100m from the farms electrical supply. Overcome this with 25mm cables and installed wifi to the barns.

Planning Permission:
Listed Building Consent, Grade II  

​

G99 Approval with no restrictions.

 

Design: 1 x Sunsynk 16 KW MAX Inverter with 30.7 KW Sunsynk LiFEPo4 Batteries. Parallel PV strings to prevent energy losses within the system
 

* Tree value equivalent to 30 year oak trees co2 reduction.

georges.JPG
Screenshot 2023-11-19 at 00.11.02.png

Commercial Project:
222 Panels 3 Metal Roofs

Coming Soon - in build
 

Client: HONDA

Installation: December 2023
Array: 222 Panels 24 Parallel Strings   

Modules:  Trina
System Size: 93.24 kW

Annual Generation: 80999 kWh

Tree Value: 3923*

Annual CO2 Reduction: 20700 kgs

​

Project brief: 
The site consumes substantial electricity. Apart from cost reduction, the clients wanted minimal dependency on the grid and enhanced green credentials.

 

Challenges: 
To design a system with maximum 
efficiency with minimal energy losses and huge performance.
 

G99 Approval with export restrictions.

​

Design: 24 parallel PV strings to maximise energy generation, 1 x Growatt 70 KW MAX Inverter.
 

* Tree value equivalent to 30 year oak trees co2 reduction.